Firstly, the entire pipeline construction process of the fountain water supply system and return system must strictly follow the well leak
proof treatment of the fountain pump room and the wall and concrete node nodes of the piping, as shown in the attached diagram.
Multiple attractions of the fountain company can be connected by water features to form an organic scenic area, thus playing a role in
inducing tourists to enjoy the scenery. Water features can also be used to divide a scenic area, forming multiple independent yet interconnected and echoing attractions, which can enhance the viewing value and fun. A music fountain is a type of fountain created for entertainment that can move around. A system that can control music is added to the fountain, and the computer recognizes the audio signal to ultimately control the system, allowing the perfect combination of lighting, color, and music to create a three-dimensional image based on aesthetic design.
Fountain equipment improves the climate of residential areas: Water feature engineering can purify the air similar to the sea, forest, grassland, and rivers and lakes, making the air in the scenic area cleaner, fresher, and wetter, making tourists feel relaxed, energized, and eliminating irritability. The installation of concrete walls must be combined before entering the closed water acceptance and the next step after construction by civil construction workers. The water supply project for the fountain pool outside should undergo a circulating water pressure test until the installation is completed. Irrigation and drainage pipelines should be tested.
The water supply system consists of two stages: installation and installation of water supply nozzles. Situation C circuit supplies water fountain to the main circuit CR=3.5 meters ring network. Due to the small radius of the ring network, customization is required using three-stage ring arc welding, which has strong welding and cushion layers. The effect cannot be manufactured using displacement and deformation effects during the welding process. The circuit uses a nozzle spring and also adds a gas nozzle, also known as a bubble head or pearl head. The intake water spray tank forms a posture of water mound white water filled with air. The nozzle can be used to obtain less water plump landscape, and it can be widely used in various occasions. The uniform spray nozzle shall pay attention to the elevation and height of the pool and the elevation of the overflow tank water level when installing the sprinkler to ensure that the water level is at the same level. At the same time, whether the quality of the nozzle and construction is good or bad has the most direct impact on the entire fountain system.
Therefore, in the construction of the nozzle, it is necessary to:
1. Domestically produced, the quality varies greatly, and the quality of the spray nozzle is very unstable. Therefore, it must be individually matched with the standard for receiving each nozzle.
2. Install and flush the network before installing the nozzle.
3. The front nozzle should be larger than 20 times the diameter of the nozzle or the straight pipe should be equipped with a rectifier device.
4. The same functional groups in the form of fountain installation heads should be the same.
5. Concealed installation of nozzles with obstacles in the direction of flow. The return water system includes the return oil pipe and the return well, mainly for construction to ensure that the water level is consistent in the fountain, the water level in the return well, and the water level in the pump room. In order to maintain the water level, the recharge well needs to have good anti-corrosion and anti-seepage properties, and must be poured with reinforced concrete. Secondly, due to the complexity of the internal pump station equipment and the criss crossing pipelines, construction must consider the overall structure of the pump station at an appropriate position. The equipment, pipeline routes, height of the device, and installation brackets must be combined and considered to ensure a reasonable layout, structure, user-friendly operation, and maintenance of the pump station. The Earth Square Fountain Water Fountain System Project is equipped with a centrifugal pump and a water pump room, and an independent system is established to effectively ensure long-term stability and facilitate later maintenance work.
When installing the pump, the following points should be noted:
1. Before installation, the overall longitudinal direction and vertical height difference should be considered to make the whole unified, coordinated and aesthetically pleasing;
2. During installation, the first centerline of the pump is drawn on the surface to determine the distance between both parties, and the construction drawings are carefully controlled to inspect and correct the equipment in advance. Check the pump level of the standard instrument by tightening the bolts and nuts. If it is not horizontal, the edge of the horn should be flat on the base.