Briefly describe the built-in fountain equipment installation process

May 08, 2017

Leave a message

Connect the water supply and municipal wells, fountains of well structure and drainage pipes, as well as the principles of linear, near the latest, Tibet's most convenient routes. Under normal circumstances, Frost is lower than that of local water supply and drainage piping buried deep. In practical work, often because of municipal drainage wells water level than the reservoir elevation above, can't find a natural slope water, reservoir drainage automatic forced drainage system. Taking of reservoir watershed and does not need to set the overflow pipe. Fountain control cables through the cable between control systems and underwater lighting, if cable armoring, rather than from tank to pump rifled tube and connection points to the submersible motor. According to the distance between the control room and ink fountain structure and direction, and set several pipe thread rational threaded hole in the middle.

If the control cable and submersible pumps and underwater lights, lanterns and reservoir joint, also set up around the reservoir connection, so there is no contact. Average threads 0.8 meters depth. Embed the fountain of pipelined projects, require coordination with other project Division of up-front, and road, everything is so embedded in the work must be comprehensive, other projects before detailed and most complete in the overall design of the fountain, in order to avoid later changes and rework, and lead to unnecessary losses.


Send Inquiry